Date | Work | Oskar (hours) | Simon (hours) |
2012.11.15-2013.6.1 | Plan, Budget, Contract | 50 | 50 |
2013.7.3 | Got delivery from EVE (controller box, electric motor, and vakuum pump) and repported missing stuff (curtis gauge, power cables, multipole connector, potentiometer, manual, switches) | 4 | |
2013.9.4 | Sand blasted two rims. Painted them too | 4 | |
2013.9.8 | Sand blasted two rims. Painted them too. Fetched sand from forest. | 5 | |
2013.9.9 | Begun to veld and fix rusted areas under the front window. | 3 | |
2013.9.10 | Welded rust | 3 | |
2013.9.13 | Welded rust. Fixed dent. | 2 | 6 |
2013.9.14 | Welded rust. front window done. Removed windscreens. | 3 | 4 |
2013.9.20 | Started to repair damaged section rear, and under windows. Removed seats and other stuff. | 5.5 | 6.5 |
2013.9.21 | Repair on the damaged section aft. Started to mesh two trunk hatches to one. Organized stuff from the car. | 6 | 6.5 |
2013.9.22 | Worked with the trunk hatch. Started on our own blog | 3 | 6 |
2013.9.23 | Same again | 3.5 | |
2013.9.24 | Trunk hatch done and mounted. Adjustments to the repaired section rear to match the repaired trunk hatch. Measured gearbox and electric motor dimensions. | 6 | 6 |
2013.9.27 | Welded on the sliding door. Grinded away rust in the engine compartment. Test mounted driver seat | 4 | 4 |
2013.9.28 | Sliding door done. Welded shut unused hatch inside the car. Fixed engine lid. Grinded in the engine compartment. | 5.5 | 7 |
2013.9.29 | Welded shut holes. Planned the ventilation system. Removed old junk under the car. Removed windows from doors. Working with driver seat. | 4 | 6.5 |
2013.9.30 | Welded holes from old ventilation system. Cleaned the workshop. | 2 | |
2013.10.1 | Repaired beam under the car. Grinded in engine compartment and working with driver seat. | 4 | 4 |
2013.10.2 | Repaired beam under car. Painted. | 2.5 | |
2013.10.3 | Welded away small holes from VW-badge. Driver seat now ok. Meeting with Michael from PAF. Delivery from EVE: Multipole connector, circulating pump for cooling and some switches. (Now mising: manual, potentiometer, powercables) | 1.5 | 1.5 |
2013.10.5 | Grinded in the engine compartment. | 4 | |
2013.10.6 | Grinded in the engine compartment. Started to repair left side panel, lower section. | 4 | 9 |
2013.10.7 | Bought steel from the neighbour workshop. Manufactured new lower left side panel and prepaired to mount it. | 3 | |
2013.10.8 | Tried to mount panel, but had problem with old damage covered with TIN!!!! Grinding work. | 4 | 4 |
2013.10.9 | Repeared left wheelhouse. Prepared welding of holes inside the car. | 6 | 7.5 |
2013.10.11 | Welded shut holes inside the car. Finished our own blog | 4 | 3 |
2013.10.12 | Same again. Started to remove rusted metal from beams in the engine compartment. Polished door handle. | 6 | 6 |
2013.10.13 | Constructed new sheets of metal, and velded them into place in the engine compartment. Repeared sliding door. Tried to dismount the sliding door handle. | 3.5 | 6 |
2013.10.14 | Grinded the veld from yesterday and velded shut holes in the engine compartment. Painted it all gray. Bought steel sheet from the neighbour workshop. | 5 | |
2013.10.15 | Got repair parts delivered from Paruzzi. Started to mount panel under engine lid. Installed suspension front left. | 3 | 3 |
2013.10.16 | Panel from yesterday done. Begun to work with the drivers step and floor (which was all rusted). Sand blasted left brake caliper. Checked other brake components. | 6 | 12 |
2013.10.17 | Welded floor, inner step and outer step on the drivers side (and some major repear inside the wheelhouse). Unscrewed the two rear hub nuts (required some heating). Test mounted rear brakes and found out that some parts were not ordered. Manufactured connector for pressurized air for the brake calipers, since the pistons were rusted. Did not help. | 8 | 9.5 |
2013.10.18 | Grinded the velded areas from yesterday. Started to change the left door outer panel. Worked with gear shifter and shift rod etc. | 6 | 8 |
2013.10.19 | Worked with the door panel. Updated blog | 2 | 3 |
2013.10.20 | Left door panel done. Tested and dismounted gear box. | 8.5 | 8.5 |
2013.10.21 | Fixed the gear rod. | 3 | |
2013.10.22 | Renovated brake calipers. One piston broke. Must try to fix a new one, othervise order a new caliper. Fixing on the blog. Updated this table with everything above. | 3 | 7.5 |
2013.10.25 | Meeting with our supervisor from the school. Then fixed rusted area on passenger side floor and step. Fixed the rusted parts of the door too. Fixed error on blog. Fixed left front brake and started to remove old brake lines. | 8 | 9.5 |
2013.10.26 | Removed rusted panel under the sliding door. Repaired rusted metal behind the old panel and then Welded the new panel into place. Fixed front left brake. Cleaned the gear box. | 4.5 | 8 |
2013.10.27 | Constructed a new body panel lower part for the front right wheel house. Updated the blog | 1 | 4 |
2013.10.28 | Cut away lower part of right rear side panel and corner and battery tray (new parts are going to be welded into place soon). Started to repair rusted part of the right rear wheelhouse. | 4 | |
2013.10.29 | Meeting with Lasse and Basse. Discussed how to connect motor and transmission the best way. Received clutch assembly. Welded battery tray into place. | 4 | 6.5 |
2013.10.30 | Prepared welding of left side panel. Took some messurement of the gearbox and motor for the adapterplate | 3.5 | 4 |
2013.11.1 | Started to put in the new brake lines. Prepared Welding job. | 3 | 3 |
2013.11.2 | Continued with the brake lines. Welded left side panel. | 6 | 8.5 |
2013.11.3 | Took away the drive shafts and fixed one brake line. Did the last stuff on the left side panel. Started to repair damaged (read gone) section behind right side panel before welding of the new right side panel. | 5 | 9.5 |
2013.11.7 | Repair of the damaged section done. | 1.5 | |
2013.11.8 | Worked with the right side panel (ready for welding now). | 2 | 5 |
2013.11.9 | Welded on side panel. Messured and planned the adapterplate | 3 | 3 |
2013.11.10 | Welded the inside of the new right side panel. Grinded the weld. Repaired a rusted spot on the right side and one in the front of the car. | 6 | |
2013.11.11 | Welded right rear corner into place. Had to make a couple of adjustments to the new corner panel due to poor fit. Updated the cad drawing | 3 | 6 |
2013.11.12 | Updated the blog. Started to fix on the vacuum system. Grinded the weldings from yesterday. Welded new fastenings for right rear lamps. Took measurements for the new left middle side panel (lower part). | 6 | 4.5 |
2013.11.13 | Bought steel from the neighbour workshop. Started to make a whole new lower left side panel (because of what happend 2013.10.8) | 2.5 | 5.5 |
2013.11.14 | Worked with the left side panel. | 3 | |
2013.11.15 | Welded side panel. | 1 | |
2013.11.16 | Welding of side panel done. Grinded the weld. All major body work welding done. | 3.5 | |
2013.11.18 | Installed the vacuum pump. Welded shut the old petrol cap. Worked with corrosion protection. | 2 | 3.5 |
2013.11.19 | Worked with corrosion protection and water sealing. | 4.5 | |
2013.11.20 | Worked with corrosion protection and water sealing. | 1 | |
2013.11.22 | Worked on the controller | 3 | |
2013.11.23 | Worked on the controller, updated the blog | 3 | |
2013.11.26 | Worked on the controller | 3 | |
2013.11.27 | Worked on the adapterplate | 2 | 2 |
2013.11.28 | Worked on the adapterplate | 2 | 2 |
2013.11.30 | Worked on the controller | 2 | |
2013.12.1 | Worked on the controller | 2 | |
2013.12.03 | Worked on the adapterplate. Got a cooler at the junkyard | 3.5 | 3.5 |
2013.12.11 | Tested cooling fan and thermostat temperature limits. Dismounted and repaired clutch disengage arm and adjusting nut. Planned mounting of the throttle. Controller work. | 1 | 2.5 |
2013.12.22 | Worked on the controller | 3 | |
2013.12.27 | Updated the blog. | 2 | |
2014.01.11 | Worked with adapter plate in cooperation with Basses Motor. | 0.5 | 6 |
2014.01.26 | Worked on the controller | 3 | |
2014.01.30 | Total work hours with the "electric cars" survey | 2 | 10.5 |
2014.02.02 | Finnished the major work on the coupling betweem the electric motor and the gearbox in cooperation with Basses Motor. NICE! Updated the Blog | 2 | 8 |
2014.02.03 | Paper work, mail and ordering parts | 5 | |
2014.02.04 | sent "electric cars" survey to 280 companies. Tried to recieve energy data about Ă…land. Trying to get batteries for testing out the controller and electric motor. | 3 | |
2014.02.05 | Preparations for the writing process | 2 | 2 |
2014.02.07 | Preparation for testing of motor and controller | 2 | |
2014.02.08 | Tested electric motor and controller. Did not start. Probably need another potentiometer for the regenerative braking funktion... | 6 | 6 |
2014.02.10 | Succesfully tested motor and controller. The problem was an interlock function that needed an input signal. | 3.5 | 3.5 |
2014.02.12 | Updated the blog | 3 | |
2014.02.16 | Preparing for tomorrow. | 3 | 3 |
2014.02.17 | Worked on the controller mounting, brake system and went to basse for the last adjustment on the adapter plate. | 11.5 | 11.5 |
2014.02.18 | Finnished with the controller mounting. Tested the adapter plate. Decided it needs to be balanced. | 7.5 | 7.5 |
2014.02.19 | Started to change oil on the transmission but found a problem so now we need to open it and check. Sent the adapter plate to be balanced. | 3.5 | 3.5 |
2014.02.20 | Worked on the transmission. Mounted the transmission and motor in the car for some messurements. | 5.5 | 5.5 |
2014.02.23 | Updating the blog, and worked on our paper. Worked on motor holder. | 5 | 5.5 |
2014.02.27 | Worked on paper | 2 | |
2014.03.01 | Finished the work on the new motor holder. Working on the paper. | 5 | 8.5 |
2014.03.03 | Worked on paper | 2 | |
2014.03.7 | Transported the batteries to the workshop.Meeting with Michael and Lackcenter. | 5 | 4 |
2014.03.8 | Worked on the paper | 6 | |
2014.03.9 | Worked on the paper | 2 | |
2014.03.13 | Prepared the car for the blastring and tested the batteries. | 9 | 9 |
2014.03.14 | Finished the testing on the batteries. | 2 | |
2014.03.15 | Worked on the paper | 4 | |
2014.03.16 | Worked on our paper. Brought back the car after soda blasting | 6 | 7 |
2014.03.17 | Updated the blog. Worked on the paper | 6 | 5 |
2014.03.18 | Cleaned the car from the soda. | 4.5 | |
2014.03.19 | Worked on the paper | 4 | |
2014.03.22-24 | Worked on the paper | 6 | 6 |
2014.03.25 | Worked on the paper | 2.5 | |
2014.03.26 | Worked on the paper | 2 | |
2014.03.27 | Working on the brakes. | 5 | 5 |
2014.03.28 | Preparing for the paint. Built on battery box. | 6.5 | 6.5 |
2014.03.29 | Preparing for the paint. Built on battery box. | 6.5 | 6 |
2014.03.30 | Wrote the examination meeting minutes and sent it to Kjell Dahl and Oskar. | 0.5 | |
2014.03.31 | Tested balanced fly wheel, and transmission together. Worked nice. Tested 96V charger with no luck. Manual reading in progress. | 6 | 5.5 |
2014.04.1 | Preparing for the paint. final mounted the electric motor, flywheel, clutch and gearbox. | 6.5 | 3 |
2014.04.2 | Preparing for the paint. | 6.5 | |
2014.04.4 | Preparing for the paint. Borrowed a seat from PAF over the weekend to finnish battery box and fastenings. bought wood board and steel. | 8.5 | 8 |
2014.04.5 | Preparing for the paint. Finnishing the work on the paper | 7 | 6.5 |
2014.04.6 | Preparing for the paint. Updating the blog. worked with the final touch on the paper. Built on the battery box. | 6 | 10.5 |
2014.04.7 | Working on the presentation. Cleaned the work shop. | 3.5 | 2.5 |
2014.04.8 | Battery box. Filling up brake system with brake fluid. | 3 | 5.75 |
2014.04.9 | Battery box. Preparing for the paint. | 3.5 | 3 |
2014.04.10 | Battery box welding and painting. Assisted Per Erik with metal job. | 5 | 8 |
2014.04.11 | Meeting with PAF. Built mountings for liquid cooler. Made fastenings for the 12V system batteries. Painted battery box the last time. | 6.5 | 7 |
2014.04.12 | Painted the motorhold. | 4.5 | |
2014.04.13 | Repared all the holes in the car floor. Painted a little. Welded shut a hatch that was cut open for Per Erik the metal master. | 7 | |
2014.04.14 | Preparing for the paint. found out why the 96V charger was not working (lets call it bad connection...) | 5 | 2.5 |
2014.04.15 | Preparing for the paint. | 8 | 5.75 |
2014.04.16 | Preparing for the paint. | 8 | |
2014.04.17 & 19 | Assembled the gas pedal mechanism with metal vire etc. worked, but bad "feel" in the gas pedal. Going for plan B. | 9.5 | |
2014.04.20 | Preparing for the paint. | 5.5 | |
2014.04.21 | Preparing for the paint. Made new gas pedal mount. started to make new wooden sheets for interior. Started to correct the examination paper. | 7 | 7.5 |
2014.04.22 | Corrected paper. Made the rest of the wooden sheets for interior. | 5 | 4.25 |
2014.04.23 | Corrected paper, just some small touches left. Applied grease at grease points on VW-bus. Delivered seat and interior sheets to PAF. | 4 | |
2014.04.24 | Straightened out the rear bumper from hell. | 4 | |
2014.04.25 | Final touch on examination paper. sent it away to swedish teacher. | 1.5 | |
Preparing for the paint. | |||
Preparing for the paint. Straightened out front bumper. | |||
Total amount of hours | Oskar (hours) | Simon (hours) | |
1109.25 | 499 | 610.25 |